Just heard they have started dismantling the old 3 mile bridge. I say sweetin the 3 barges up and make the gilcrest and 3 barges one big long reef. Turpin What do you think?
 

·
Registered
Joined
·
781 Posts
Just heard they have started dismantling the old 3 mile bridge. I say sweetin the 3 barges up and make the gilcrest and 3 barges one big long reef. Turpin What do you think?
Man that would be freaking awesome! Knowing our local government, they'll sink it 30miles offshore. Or send it somewhere else. :whistling:
 

·
Registered
Joined
·
9,704 Posts
Discussion Starter #4
Are you talking about the remains of the 3 mile bridge that are now fishing piers ? If so removing the one on the P-Cola side is going to have some people up set
Nope the old 3 mile bridge that was just replaced by the new 3 mile bridge.
 

·
Registered
Joined
·
513 Posts
If one of ya'll see the bridge rubble barge headed out, keep an eye out to see where it is going. My money is on the area between the Paradise hole and The Ocean Wind Tug where they just put all those limestone reefs. But who knows. Adding to the three barges would be nice too.
 

·
Registered
Joined
·
127 Posts
not sure of the exact location, but it will be removed in complete spans and dropped along our coast. Should provide great structure for reef fish. The tilt barges that were built for this project can handle 2 sections at a time.
 

·
Clint aka noworyz
Joined
·
68 Posts
It will be put within this area as explained to me at the EMAC meeting this past Monday when I asked Robert about the progress. Robert is directly involved and indicated Skanska is meant to be doing this almost immediately... this particular area is listed in the reef area on the Escambia County website and available to all...
 

Attachments

·
Green Eggs And Ham
Joined
·
9,762 Posts
It will be put within this area as explained to me at the EMAC meeting this past Monday when I asked Robert about the progress. Robert is directly involved and indicated Skanska is meant to be doing this almost immediately... this particular area is listed in the reef area on the Escambia County website and available to all...



Thx, I know exactly where that is. :thumbup:
 

·
Green Eggs And Ham
Joined
·
9,762 Posts
I'll text Robert mid morning to verify but I'm sure thats what he told me... it was a rather exhaustive meeting due to all the galvez landing discussions..



thx for the info, that area is 6 miles x 1.5 miles and it is going to be an insane amount of fish on it. The top portion runs right in the middle of the paradise hole. This way nobody can focus on one area and wipe them out, like a single reef ball/tug/barge, the reefs are so close together the fish can move around easy and avoid the noobs lol.
 

·
Clint aka noworyz
Joined
·
68 Posts
thx for the info, that area is 6 miles x 1.5 miles and it is going to be an insane amount of fish on it. The top portion runs right in the middle of the paradise hole. This way nobody can focus on one area and wipe them out, like a single reef ball/tug/barge, the reefs are so close together the fish can move around easy and avoid the noobs lol.
the gaps are placed where live bottom is known as there were restrictions regarding the reef placement..... the entire project has been described as the largest reefing project in the state of Florida...
 

·
Registered
Joined
·
9,704 Posts
Discussion Starter #16
Great idea on placement area. Now if they would just completly shut down flounder for October November and December for one or two years the depleted population would return like the Snapper population has. Just those 3 months during there spawning run.
 

·
Super Moderator
Joined
·
28,496 Posts
Problem dumping 3MB out there is just like the Mass....It'll end up floating down to Cuba.


Ohhhh wait, concrete sinks, steel floats------disregard, carry on!
 

·
Registered
Joined
·
9,704 Posts
Discussion Starter #18
I also hope when they put the sections down they dump pilings first and then put the sections on top of the pilings to create spaces and keeping the flat sections from sinking into the sand like the area a little SE of the Pattie Barge did after 6 years. And the old Casino.
 