Skanska deployed approx. 150 concrete piling cut-off pieces (approx. 800 tons) in Escambia Near-Shore East Artificial Reef Site at 30 Deg 17.750'N; 087 Deg 13.500'W (approx. 4.5nmi ESE of Pensacola Pass). Water depth at the site is 45 feet.
 

Attachments

·
Registered
Joined
·
834 Posts
It was reported to be a test run for them to see if it is feasible to dump all the old 3 mile rubble out there or recycle it.
 

·
Registered
Joined
·
9,505 Posts
Glad to see more stuff going out. But if they push those small concrete pieces like in the picture they will be under the sand covered up in a year. There is a spot to the sw of the barges that has covered up from a few stotms. That would be a good spot to put small pieces of concrete. On top of the old stuff.
 

·
TJ McBoatFace
Joined
·
321 Posts
Any word on plans for the bridge rubble once they tear down the existing bridges? Agree it would be nice to place it in such a way that it stays above the sand for a few years.
 

·
Banned
Joined
·
3,774 Posts
Update: As stated before test runs to access cost vs crushing for recycling and selling and we have another concern as I understand someone wishes to purchase the slabs/spans. So a 6 mile long reef near the pass we all hope may not be a done deal.
 

·
Registered
Joined
·
9,874 Posts
Update: As stated before test runs to access cost vs crushing for recycling and selling and we have another concern as I understand someone wishes to purchase the slabs/spans. So a 6 mile long reef near the pass we all hope may not be a done deal.



'Mo MONEY…… shoot, how cool would that have been?
 

·
Super Moderator
Joined
·
28,293 Posts
That close and shallow will be good fer a little while but I will agree that the sands will cover most of it up after a few years...
 
1 - 20 of 20 Posts
Top