Go Back   Pensacola Fishing Forum > Piers and Bridges > Piers and Bridges - General Q & A

Reply
 
LinkBack Thread Tools Display Modes
Old 01-30-2010, 09:22 PM   #1
Member
Ruby Red Lip
 
olilly's Avatar
 
Join Date: Mar 2008
Posts: 76
Default 3 mile bridge

<H2 class=singletitle>Three-Mile Bridge has six years left?</H2><DIV class=entry>



Navarre Press is reporting Jim DeVries of the Florida Department of Transportation told members of the Florida-Alabama Transportation Planning Organization yesterday at their meeting in Milton that the Pensacola Bay Bridge is ?structurally deficient? and must be replaced within six years.

?The bridge is safe, there?s no problem driving on it, but it is a signal that we need to make (bridge replacement) a higher priority.?

Read more. MAYBE IF WE MAKE ENOUGH NOISE WHEN IT GETS CLOSE TO CLOSING THE 3 MILE BRIDGE ESCAMBIA WILL DO THE RIGHT THING AND NOT SCREW US LIKE THIS CRAP THEY ARE PAWNING ON US FOR AS A REPLACEMENT TO THE FISHING BRIDGE THAT IVAN DESTROYED. THEY ARE SO CROOKED I AM SURE THEY WILL FIND A WAY TO BEND US OVER WITHOUT A REACH AROUND.!!!!!!!!</DIV></DIV>
olilly is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off




All times are GMT -4. The time now is 09:32 AM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 RC 2