RE: 3 mile bridge p-cola side
From everyone I've talked to at both the country and city the bridge is going to open mid to late January like stated above. It will be a drive on bridge and when first opened there will be no store/concession. At the moment the county is in control of the bridge and the city is in control of the building at the foot, although the plan is for it to be leased as one entity in the future.
|